Aba South; Ngwa Road–Alaoji corridor plus connecting works · evidence 2025-11-25
Reconstruction / dualisation of Port Harcourt Road, Aba
State 2026 budget address reports completed in 2025
- Officeholder at evidence
- Alex Otti (2023 year also spans predecessor Okezie Ikpeazu)
- Delivery agency / contractor
- Abia Ministry of Works / Julius Berger Nigeria Plc
- Verified lifetime actual spending
- Not established in this file
₦5,000,000,000
reported annual actual capital expenditure · 2023
2023 actual in project line 34001001/23020114/17000011. Only one fiscal year, not lifetime project cost. Table retrieved through indexed official PDF; verify original page before automated numeric import. Indexed official table; original PDF row requires editorial verification.
Financial source ↗- Official 2023 scope is 6.8 km, split 5.7 km and 1.1 km. Later reporting varies 6.5–6.7 km; preserve original scope and revisions separately. Do not repeat political comparison of USD29m vs USD22m as an audited like-for-like finding.
Dated condition photographs at source
State monthly update page 7 contains road aerial image; download unavailable in this research pass · 2025-05 ↗Source photographs are linked with their dates. They do not establish today’s condition. Reuse permission has not been confirmed.