THE NIGERIA PAPERS / AFRICA BUILDS

Africa builds.
Nigeria deserves more.

Factories. Railways. Power. Possibility.

Across Africa, resources are becoming things people can use. See what was built, what it cost, and what Nigeria’s money could deliver. Then ask the question that matters: where is our own value?

18 project records8 country collectionsCosts in USD sources & scope shown
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
ON THE MAP / MOROCCO

Infrastructure.
Industry. Ambition.

Tanger Med · explore the sourced record below

FOLLOW THE ACHIEVEMENT↗COMPARE THE MONEY↗DEMAND BETTER

THE MONEY QUESTION

Big numbers.
Real-world possibilities.

Borrowing must buy public value. Corruption has a human cost. Put a documented Nigerian amount beside an African project and see the scale for yourself.

World Bank-approved reform financing. This is not a finding of theft, waste, disbursement or unspent cash.

Read the original record · 13 June 2024 ↗Project cards below show nominal dollar ratios where a documented dollar cost is available. These are scale illustrations, not construction budgets or proof of equal conditions.

THE ACHIEVEMENT VAULT

Built across Africa.

Older landmarks. New ambition. A growing public record.

SOURCE-LINKED COLLECTION
18 project records across the collection
01🇧🇫 Burkina Faso / Industrial processing
RAFFINOR-BF refinery exterior · operator’s inauguration gallery, September 2026
RAFFINOR-BF refinery exterior · operator’s inauguration gallery, September 2026 · RAFFINOR-BF gallery · Publisher photograph · rights retained · resized; no crop
Inaugurated · 28 September 2026

Gold dug here. Value added here.

RAFFINOR-BF gold refinery

Ownership / funding: State investment through SONASP with private partners; percentages not established.

Burkina Faso’s refinery puts domestic gold processing in the spotlight. The next test is sustained production, beyond the opening ceremony.

COST · US DOLLARS
US$19MReported approximate USD equivalent · 2026Approximately US$19 million — AP’s rounded dollar equivalent of the reported investment of over FCFA 11 billion, 29 September 2026. Reported investment, not audited final expenditure.
THE TIMELINE
28 September 2026
WHAT WAS BUILT
164 tonnes/year theoretical phase-one capacity. A proposed 515-tonne phase two is not delivered output.
Open the evidence file 2 sources ↗
Who owns / delivers it?
State investment through SONASP with private partners; percentages not established.
Reported activity
Ministry reports first bars at the inauguration. Sustained annual throughput not established.
What still needs checking?
Gold processing and petroleum refining have different commodities and scope. This ceremony does not establish changes in national living standards.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

02🇧🇫 Burkina Faso / Textiles / cotton processing
Cotton-to-textile manufacturing · editorial illustration, not a photograph of TEXFORCES-BF
Cotton-to-textile manufacturing · editorial illustration, not a photograph of TEXFORCES-BFCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Inaugurated — official report · 2026-09-09

From cotton fields to finished cloth.

TEXFORCES-BF cotton-to-textile complex

Ownership / funding: Public-resource financing including social-security funds and state companies, according to the Finance Ministry; not established as debt-free.

A new textile complex was inaugurated in Bobo-Dioulasso in September 2026. The financing and launch are documented; future output claims remain targets.

COST · US DOLLARS
US$30MReported dollar equivalent · 2026Approximately US$30 million — Xinhua’s 9 September 2026 reported equivalent of FCFA 17 billion. Sources describe this amount as investment/capital; it is not an audited final construction account.
THE TIMELINE
Inaugurated 2026-09-09, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Textile and garment production. Xinhua reports an initial design rate exceeding 12 tonnes of cotton fibre per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Public-resource financing including social-security funds and state companies, according to the Finance Ministry; not established as debt-free.
Reported activity
Inauguration verified through official sources and Xinhua. Sustained throughput and actual employment not independently established.
What still needs checking?
Official initial and eventual capacity/jobs figures differ. Expansion targets are not present output; social-security funding is not free money.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

03🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2024-11-30
Official publisher photograph from the project’s inauguration report · 2024-11-30 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2024-11-30

Keep the tomato harvest’s value at home.

SOBTO / A’diaa tomato-processing factory

Ownership / funding: Community shareholding promoted through APEC; not simply a wholly state-funded factory.

The Bobo-Dioulasso factory was inaugurated after construction launched in September 2023. Its ownership model uses community shareholding.

COST · US DOLLARS
US$12.37MApproximate USD scale conversion · 2024 reference FXApproximately US$12.37 million, calculated as FCFA 7.5 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 7.5bn investment reported by L’Economiste du Faso, 21 September 2026; official launch source does not state the cost.
THE TIMELINE
Construction launched September 2023; inaugurated 30 November 2024, around 14 months later.
WHAT WAS BUILT
Officially reported processing capacity: 100 tonnes of tomatoes per day; not verified daily production.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Community shareholding promoted through APEC; not simply a wholly state-funded factory.
Reported activity
Presidency calls the factory operational at inauguration. Current utilisation and sales not independently verified.
What still needs checking?
Community subscriptions are not the same as a public grant. Job projections and design capacity are not measured outcomes.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

04🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2024-12-16
Official publisher photograph from the project’s inauguration report · 2024-12-16 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2024-12-16

A cooperative project brought to the finish line.

SOFATO tomato-processing factory, Yako

Ownership / funding: SCOOP-CA Bâtir l’Avenir cooperative with state support; Presidency reports FBDES FCFA 1bn and APEC FCFA 400m contributions.

Yako’s tomato plant opened in December 2024 with community finance and public support. The official account says an existing project was helped to restart.

COST · US DOLLARS
US$9.32MApproximate USD scale conversion · 2024 reference FXApproximately US$9.32 million, calculated as FCFA 5.65 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 5.65bn reported by L’Economiste; Presidency states over FCFA 5bn. These are descriptions of the same investment, not additive.
THE TIMELINE
Existing cooperative project supported/relaunched under Traoré; inaugurated 16 December 2024. Original construction start not established.
WHAT WAS BUILT
Reported design capacity: 100 tonnes of tomatoes per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
SCOOP-CA Bâtir l’Avenir cooperative with state support; Presidency reports FBDES FCFA 1bn and APEC FCFA 400m contributions.
Reported activity
Inauguration verified; the December report scheduled product marketing for January 2025. Later actual production not established.
What still needs checking?
The cooperative project predated the administration’s support. Do not credit its entire origin to the inauguration or treat projected turnover as earnings.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

05🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2025-02-20
Official publisher photograph from the project’s inauguration report · 2025-02-20 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2025-02-20

Turn grain into a local industrial value chain.

Moulin Double Star wheat-flour mill

Ownership / funding: Private ZIDNABA-group promoter, supported by government; not a verified state-owned or wholly state-funded mill.

A privately promoted flour mill opened at Gampéla in February 2025. Its documented launch is distinct from its future production targets.

COST · US DOLLARS
US$24.74MApproximate USD scale conversion · 2024 reference FXApproximately US$24.74 million, calculated as FCFA 15 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 15bn construction cost reported by the Presidency, 20 February 2025. Not an audited final account.
THE TIMELINE
Inaugurated 2025-02-20, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Reported design capacity: 220 tonnes of flour and 80 tonnes of bran per day.
Open the evidence file 2 sources ↗
Who owns / delivers it?
Private ZIDNABA-group promoter, supported by government; not a verified state-owned or wholly state-funded mill.
Reported activity
Inauguration verified. Production volumes, import substitution and projected employment not independently measured.
What still needs checking?
Milling capacity does not establish local wheat self-sufficiency; the source separately calls for support to wheat growers.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

06🇧🇫 Burkina Faso / Building materials
Official publisher photograph from the project’s inauguration report · 2025-03-20
Official publisher photograph from the project’s inauguration report · 2025-03-20 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2025-03-20

Make the materials needed to build.

CISINOB cement plant, Laongo

Ownership / funding: Private Chinese investors, according to the Presidency; inauguration by Traoré does not make this a government-financed project.

A private cement investment was inaugurated at Laongo in March 2025. Its capacity shows industrial scale; actual output needs follow-up evidence.

COST · US DOLLARS
US$42.88MApproximate USD scale conversion · 2024 reference FXApproximately US$42.88 million, calculated as FCFA 26 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 26bn reported investment; official article published 21 March 2025 records the 20 March ceremony.
THE TIMELINE
Inaugurated 2025-03-20, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Reported design production capacity: 2,000 tonnes of cement per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Private Chinese investors, according to the Presidency; inauguration by Traoré does not make this a government-financed project.
Reported activity
Launch verified. Sustained output and actual reductions in cement prices not established.
What still needs checking?
Investment announcement is not an audited account. Do not assert all cement inputs are domestically sourced or claim the entire plant was government-funded.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

07🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2024-04-29
Official publisher photograph from the project’s inauguration report · 2024-04-29 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2024-04-29

Add value before raw materials leave.

ADIPROD Industries edible-oil and shea-processing complex

Ownership / funding: Private ADIPROD Industries SA, led by Oumou Diallo/Traoré; publicly encouraged by the administration.

The first phase of a shea and edible-oil complex was inaugurated in Bobo-Dioulasso in April 2024. The account identifies it as private investment.

COST · US DOLLARS
US$29.68MApproximate USD scale conversion · 2024 reference FXApproximately US$29.68 million, calculated as FCFA 18 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 18bn first-phase cost reported by the company’s director in the Presidency account. Not a whole-complex final expenditure audit.
THE TIMELINE
Inaugurated 2024-04-29, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Company-reported first-phase capacity: over 300 tonnes of shea kernels/oilseeds per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Private ADIPROD Industries SA, led by Oumou Diallo/Traoré; publicly encouraged by the administration.
Reported activity
Inauguration verified by Presidency and CSC. CSC described the refining component as still being developed.
What still needs checking?
An inaugurated first phase does not prove every planned component was complete. Current throughput and projected supplier benefits not independently verified.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

08🇧🇫 Burkina Faso / Roads
Road works shown by the Presidency in January 2026; not proof of completion
Road works shown by the Presidency in January 2026; not proof of completion · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Construction documented — completion unverified · 2026-01-10

A road claim you can locate and follow.

Kaya–Barsalogho road surfacing works

Ownership / funding: Faso Mêbo Koulsé brigade with military engineering earthworks, according to the Presidency.

The official report documents work on a named corridor rather than a national promise. This entry remains under construction pending completion evidence.

COST · US DOLLARS
USD cost not verifiedUSD figure not disclosedNo public project-specific cost established from the checked source. USD cost is unavailable; no amount invented.
THE TIMELINE
Promise referenced to December 2024; site observation 8 January 2026, published 10 January 2026. No verified completion date.
WHAT WAS BUILT
42 km corridor; source reports a 9-metre road footprint.
Open the evidence file 1 sources ↗
Who owns / delivers it?
Faso Mêbo Koulsé brigade with military engineering earthworks, according to the Presidency.
Reported activity
Official site report describes work underway on 8 January 2026 and preparation to lay the surface. Completion not verified.
What still needs checking?
The nationwide 3,000–5,000 km/year objective is a target, not completed road length. Equipment acquisition budgets cannot be assigned to this road.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

09🇬🇭 Ghana / Ports
MPS Terminal 3, Tema · operator photograph taken 20 August 2019
MPS Terminal 3, Tema · operator photograph taken 20 August 2019 · APM Terminals · Publisher photograph · rights retained · resized; no crop
Operating · Phases one and two commissioned 13 November 2025

Make room for trade.

Tema Terminal 3

Ghana’s expanded container terminal shows how a port investment can be examined against capacity and actual service performance.

COST · US DOLLARS
US$1.5BPPP project estimate · 2024US$1.5 billion — estimated project cost in Ghana’s 2024 PPP report. Estimate, not audited final spend.
THE TIMELINE
Phases one and two commissioned 13 November 2025
WHAT WAS BUILT
3 million TEU/year — reported capacity, not throughput.
Open the evidence file 2 sources ↗
Who owns / delivers it?
MPS concession; GPHA 30% equity, reported in the 2024 finance ministry PPP report.
Reported activity
2024 import-truck turnaround: 90 minutes against a 60-minute target. Export trucks: 40 minutes against a 90-minute target.
What still needs checking?
A public-private concession with different phases. Cost is estimated; scanner breakdowns contributed to the missed import target.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

10🇬🇭 Ghana / Ports
Dry bulk terminal berth · GPHA’s July 2022 handover report
Dry bulk terminal berth · GPHA’s July 2022 handover report · Ghana Ports and Harbours Authority · Publisher photograph · rights retained · resized; no crop
Commissioned · Initial berth handed over 25 July 2022; commissioning reported 8 December 2022

Build the route from mine to market.

Takoradi Dry Bulk Terminal

A dedicated bulk terminal gives Ghana another piece of its industrial logistics network. Its specific cost still needs stronger public evidence.

COST · US DOLLARS
US$85MReported completion cost · 2022US$85 million — completed dry bulk terminal cost attributed to the President by Ghana News Agency on 8 December 2022. Excludes the separate container terminal, dry dock and oil/gas terminal.
THE TIMELINE
Initial berth handed over 25 July 2022; commissioning reported 8 December 2022
WHAT WAS BUILT
Withheld: published capacity figures conflict.
Open the evidence file 3 sources ↗
Who owns / delivers it?
GPHA infrastructure; Amandi Ghana Limited identified as contractor.
Reported activity
Actual annual throughput not established.
What still needs checking?
Other port investments and the floating dry dock have different scopes. Their budgets cannot be assigned to this terminal.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

11🇲🇦 Morocco / Ports
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
Operating · Container activity began in 2007; subsequent expansions

Think beyond one construction contract.

Tanger Med port complex

Morocco’s port complex connects infrastructure with industrial activity. Its successive phases should be assessed separately.

COST · US DOLLARS
US$1.48BExpansion only · reported USD equivalent · 2019US$1.48 billion — Xinhua’s reported dollar equivalent of €1.3 billion for the Tanger Med 2 expansion in 2019. This is an expansion cost, NOT the cost of the entire port complex. Scope differs from the whole-complex capacity figures below.
THE TIMELINE
Container activity began in 2007; subsequent expansions
WHAT WAS BUILT
An older agency page gives 9 million nominal TEU/year. Later extensions mean this is not a current utilization denominator.
Open the evidence file 2 sources ↗
Who owns / delivers it?
TMPA, a subsidiary of Tanger Med Special Agency; distinct terminal operators.
Reported activity
11,106,164 TEU handled in calendar 2025, according to TMPA.
What still needs checking?
Whole-complex calendar-year TEU differs from first-year container counts. Transshipment location and accumulated expansions affect comparisons.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

12🇲🇦 Morocco / Rail
Al Boraq at Tangier · archival photograph, February 2019
Al Boraq at Tangier · archival photograph, February 2019 · SpreeTom · CC BY 4.0 · resized; no crop
Operating · Inaugurated 15 November 2018

A different speed of ambition.

Al Boraq high-speed service

Morocco’s high-speed passenger service offers a visible example of an operating transport investment.

COST · US DOLLARS
US$2.4BReported high-speed line cost · 2018US$2.4 billion — reported 2018 dollar equivalent of MAD 22.9 billion for the high-speed line. Reuters/AP report via Arab News, attributed to Morocco’s MAP. Historical reported cost, not a new final-account audit.
THE TIMELINE
Inaugurated 15 November 2018
WHAT WAS BUILT
Intercity Tangier–Casablanca service; 320 km/h commercial speed reported in 2018.
Open the evidence file 3 sources ↗
Who owns / delivers it?
ONCF, national rail operator.
Reported activity
5.6 million passengers during 2025 — ONCF statement, 9 April 2026.
What still needs checking?
Intercity high-speed rail differs from an urban metro. One-year passengers cannot be ranked against three-year cumulative patronage.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

13🇸🇳 Senegal / Urban transport
Electric bus rapid transit · editorial illustration, not a photograph of the actual project
Electric bus rapid transit · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operating · Inaugurated 14 January 2024; staged works continued after inauguration.

A cleaner way to move a city.

Dakar electric Bus Rapid Transit

Senegal’s electric bus corridor turns a transport plan into a service people can use. Appraisal cost and final expenditure remain different measures.

COST · US DOLLARS
US$426.3M2017-05-04 project appraisal estimateUS$426.3m total appraisal estimate in the 2017 World Bank appraisal document; includes public/private components and taxes. This is not audited final expenditure.
THE TIMELINE
2017 financing approval; service launched in 2024; later completion activities separately tracked.
WHAT WAS BUILT
18.3 km corridor, 23 stations. Planned maximum ridership is not actual passengers carried.
Open the evidence file 3 sources ↗
Who owns / delivers it?
CETUD / Senegal; Dakar Mobilité operates SunuBRT. Macky Sall was president at inauguration; operations span later administrations.
Reported activity
Operator's current website describes service seven days a week and lists September 2026 operational safety news. No audited 2026 annual ridership established.
What still needs checking?
A city bus corridor, not a whole-country outcome. Benefit projections must remain projections; planned capacity is not throughput.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

14🇧🇼 🇿🇲 Botswana / Zambia / Bridge / border infrastructure
Kazungula under construction · archival photograph, November 2018
Kazungula under construction · archival photograph, November 2018 · Gribeco / Kimon Berlin · CC BY-SA 4.0 · resized; no crop
Commissioned; operational crossing · 10 May 2021

Two countries. One connection.

Kazungula Bridge and One Stop Border Posts

Botswana and Zambia built a bridge and border facilities across the Zambezi, replacing reliance on the old ferry crossing.

COST · US DOLLARS
US$259MSADC commissioning-reported project costUS$259m reported by SADC at commissioning for the bridge and border-post facilities; AfDB reports a more precise US$259.3m. Figures refer to the same project, not additive investments.
THE TIMELINE
Works began in 2014; commissioned in 2021.
WHAT WAS BUILT
Bridge and border-post link across the Zambezi; conflicting 923m/929m length figures omitted.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Joint Botswana and Zambia project, supported by AfDB and JICA. Commissioned by Presidents Mokgweetsi Masisi and Edgar Lungu; predates current leadership.
Reported activity
Zambian State House continued to describe the bridge's trade role in February 2026. Quantified recent traffic and time savings not established here.
What still needs checking?
Border infrastructure spanning two countries. Opening ceremonies and projected trade benefits are distinct from independently measured effects.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Video loads from YouTube when you press play. Original source link remains below.

Watch official project video ↗

SADC-linked Kazungula Bridge and One Stop Border Post documentary

Official video linked directly by SADC; link or use the platform's normal embed, do not download or reupload.

15🇬🇭 Ghana / Power
Hydropower dam and generating station · editorial illustration, not a photograph of the actual project
Hydropower dam and generating station · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operational · 19 December 2013

Power that has a physical address.

Bui Generating Station

Ghana’s Bui station is a concrete reference for discussing the cost and capacity of a power investment.

COST · US DOLLARS
US$790MBui Power Authority reported total after supplementary fundingOperator reports initial US$622m estimate and US$790m total project cost after supplementary funding. Use US$790m with attribution, not both figures added together.
THE TIMELINE
EPC contract signed 19 April 2007; main station commissioned December 2013.
WHAT WAS BUILT
404 MW: three approximately 133.33 MW units plus a 4 MW turbinette.
Open the evidence file 2 sources ↗
Who owns / delivers it?
Government of Ghana / Bui Power Authority; Sinohydro EPC contractor. Commissioned during John Dramani Mahama's first presidency; initiation spans earlier governments.
Reported activity
Operator page marks station operational and describes completed maintenance. Installed capacity is not actual annual electricity generated.
What still needs checking?
Hydropower output depends on hydrology. The project includes transmission, resettlement and other infrastructure, making a bare dollars-per-MW comparison incomplete.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

Bui Power Authority station photographs

All rights reserved; link only unless separate reuse permission is obtained.

16🇰🇪 Kenya / Geothermal power
Geothermal power infrastructure · editorial illustration, not a photograph of the actual project
Geothermal power infrastructure · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operating · Construction completed in 2019; formal commissioning in July 2022.

Put the earth’s heat to work.

Olkaria V geothermal power station

Kenya’s geothermal expansion is a reference point for discussing investment in a country’s own energy resources.

COST · US DOLLARS
US$450MOperator project estimate · 2018US$450 million — KenGen’s project estimate published 31 October 2018, covering steamfield, power plant and grid connection. This is an estimate, not verified final expenditure.
THE TIMELINE
Construction began January 2017; generation and ceremony dates are distinct.
WHAT WAS BUILT
172 MW current operator-reported capacity; older planning documents quote 165.4 MW.
Open the evidence file 4 sources ↗
Who owns / delivers it?
KenGen; H-Young, Mitsubishi Corporation and Mitsubishi Hitachi Power Systems supplied/constructed components. Uhuru Kenyatta's administration at formal commissioning.
Reported activity
KenGen lists it among its generating plants. A 2026 chemistry-laboratory equipment tender corroborates ongoing plant support; actual recent annual output not established.
What still needs checking?
Technical nameplate ratings and later operational ratings differ. Geothermal conditions and bundled field-development costs affect comparisons with hydro, gas or solar.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

KenGen geothermal plant images

KenGen all rights reserved; link only pending reuse permission.

17🇹🇿 Tanzania / Rail
Electric intercity railway · editorial illustration, not a photograph of the actual project
Electric intercity railway · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operating segment; wider network under construction · Passenger-service inauguration 1 August 2024; EMU service added 1 November 2024.

Connect cities. Then measure the service.

Dar es Salaam–Dodoma electric SGR passenger service

Tanzania’s electric passenger railway links Dar es Salaam and Dodoma. This record keeps that section separate from later extensions.

COST · US DOLLARS
US$3.1BReuters-reported segment cost, 2024-08-01US$3.1bn reported by Reuters on 1 August 2024 for the Dar es Salaam–Dodoma railway. Independent cost reporting, not a retrieved audited final project account.
THE TIMELINE
Dar es Salaam–Dodoma operation is separate from later extensions toward Mwanza and Kigoma.
WHAT WAS BUILT
Electric standard-gauge intercity rail; do not claim the whole planned 2,561 km system is complete.
Open the evidence file 4 sources ↗
Who owns / delivers it?
Tanzania Railways Corporation / Government of Tanzania; inaugurated by President Samia Suluhu Hassan. Construction spans the preceding administration.
Reported activity
TRC's 2026 updates distinguish operating Dar es Salaam–Dodoma services from construction north and west of the operating segment.
What still needs checking?
Segment costs cannot be assigned to the full national SGR network. Do not treat contract totals for other phases as expenditure on this operating segment.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

TRC's electric multiple-unit launch photographs

Institutional news photos; link only unless a reuse licence is established.

18🇪🇹 Ethiopia / Industrial manufacturing
Textile industrial park · editorial illustration, not a photograph of the actual project
Textile industrial park · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operator lists operational; mixed labour and export outcomes · Operations began in 2016.

Give manufacturing a place to grow.

Hawassa Special Economic Zone / Industrial Park

Ethiopia’s Hawassa park puts industrial infrastructure on the map. A park’s existence alone does not establish jobs, exports or profitability.

COST · US DOLLARS
US$303MWorld Bank-reported construction cost · 2022US$303 million — construction cost reported in World Bank’s 2022 review, Figure 7.2 and printed page 102, citing IPDC. Distinct from the US$250 million Eurobond allocation in Figure 7.1; financing costs are additional.
THE TIMELINE
Established 2016; later renamed/described as a special economic zone.
WHAT WAS BUILT
52 factory sheds; operator says 46 rented. Its narrative and table conflict on 140 versus 300 hectares, so omit a single asserted area.
Open the evidence file 4 sources ↗
Who owns / delivers it?
Industrial Parks Development Corporation, Government of Ethiopia. Opened during Prime Minister Hailemariam Desalegn's administration; current operation spans later governments.
Reported activity
World Bank 2025 project document reports 8,281 jobs created during 2021–2024 despite AGOA-related challenges. These are reported programme-period jobs, not proof of permanent job retention or high wages.
What still needs checking?
Industrial-park activity is not a whole-economy verdict. Published experimental research on Ethiopian industrial jobs finds mixed long-term welfare results; avoid presenting all factory employment as an unqualified success.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

IPDC park profile and gallery

No open photo licence verified; link only.

A VAULT, NOT A VICTORY LAP

Keep the record growing.

This collection starts with 18 documented projects. Education, health, agriculture and water need more coverage. New source discoveries appear below; project stories require a separate evidence review before joining the vault.

Share a source
From the research desk Open collected Africa source records ↗

Research leads can concern policy or procurement rather than completed infrastructure. They are separate from the achievement vault.

Growing source desk

Latest source records

50 source records

Records from approved publishers appear automatically with original links and dates. Announcements are attributed to their authors; delivery, spending and allegations need supporting evidence.

Collection: partial · last successful check: 2026-11-03T16:04:21.840551Z.

Some sources could not be checked
  • Library of Congress: TimeoutError: The read operation timed out

Celebrating delivery. Challenging waste. Preserving the evidence.

How we verify ↗Nigeria’s projects ↗Evidence archive ↗Preview updated 24 October 2026. USD figures are historical source amounts, not current replacement prices. Cost updates have their own sources; existing project review dates are retained. Project-specific review dates are shown in each evidence file. Reading-list selections last for this page session.