Public BetaThe Nigeria Papers™ is in public beta. Source records are being expanded and verified continuously. Verified facts, documented claims, allegations, and under-review material are labeled separately. Methodology →

THE NIGERIA PAPERS / AFRICA BUILDS

Africa builds.
Nigeria deserves more.

Factories. Railways. Power. Possibility.

Across Africa, resources are becoming things people can use. See what was built, what it cost, and what Nigeria’s money could deliver. Then ask the question that matters: where is our own value?

18 project records8 country collectionsCosts in USD sources & scope shown
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
ON THE MAP / MOROCCO

Infrastructure.
Industry. Ambition.

Tanger Med · explore the sourced record below

FOLLOW THE ACHIEVEMENT↗COMPARE THE MONEY↗DEMAND BETTER

THE MONEY QUESTION

Big numbers.
Real-world possibilities.

Borrowing must buy public value. Corruption has a human cost. Put a documented Nigerian amount beside an African project and see the scale for yourself.

World Bank-approved reform financing. This is not a finding of theft, waste, disbursement or unspent cash.

Read the original record · 13 June 2024 ↗Project cards below show nominal dollar ratios where a documented dollar cost is available. These are scale illustrations, not construction budgets or proof of equal conditions.

THE ACHIEVEMENT VAULT

Ethiopia

Older landmarks. New ambition. A growing public record.

SOURCE-LINKED COLLECTION
1 project records in Ethiopia
01🇪🇹 Ethiopia / Industrial manufacturing
Textile industrial park · editorial illustration, not a photograph of the actual project
Textile industrial park · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operator lists operational; mixed labour and export outcomes · Operations began in 2016.

Give manufacturing a place to grow.

Hawassa Special Economic Zone / Industrial Park

Ethiopia’s Hawassa park puts industrial infrastructure on the map. A park’s existence alone does not establish jobs, exports or profitability.

COST · US DOLLARS
US$303MWorld Bank-reported construction cost · 2022US$303 million — construction cost reported in World Bank’s 2022 review, Figure 7.2 and printed page 102, citing IPDC. Distinct from the US$250 million Eurobond allocation in Figure 7.1; financing costs are additional.
THE TIMELINE
Established 2016; later renamed/described as a special economic zone.
WHAT WAS BUILT
52 factory sheds; operator says 46 rented. Its narrative and table conflict on 140 versus 300 hectares, so omit a single asserted area.
Open the evidence file 4 sources ↗
Who owns / delivers it?
Industrial Parks Development Corporation, Government of Ethiopia. Opened during Prime Minister Hailemariam Desalegn's administration; current operation spans later governments.
Reported activity
World Bank 2025 project document reports 8,281 jobs created during 2021–2024 despite AGOA-related challenges. These are reported programme-period jobs, not proof of permanent job retention or high wages.
What still needs checking?
Industrial-park activity is not a whole-economy verdict. Published experimental research on Ethiopian industrial jobs finds mixed long-term welfare results; avoid presenting all factory employment as an unqualified success.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

IPDC park profile and gallery

No open photo licence verified; link only.

A VAULT, NOT A VICTORY LAP

Keep the record growing.

This collection starts with 18 documented projects. Education, health, agriculture and water need more coverage. New source discoveries appear below; project stories require a separate evidence review before joining the vault.

Share a source
From the research desk Open collected Africa source records ↗

Research leads can concern policy or procurement rather than completed infrastructure. They are separate from the achievement vault.

Growing source desk

Latest source records

50 source records

Records from approved publishers appear automatically with original links and dates. Announcements are attributed to their authors; delivery, spending and allegations need supporting evidence.

Collection: partial · last successful check: 2026-11-03T16:04:21.840551Z.

Some sources could not be checked
  • Library of Congress: TimeoutError: The read operation timed out

Celebrating delivery. Challenging waste. Preserving the evidence.

How we verify ↗Nigeria’s projects ↗Evidence archive ↗Preview updated 24 October 2026. USD figures are historical source amounts, not current replacement prices. Cost updates have their own sources; existing project review dates are retained. Project-specific review dates are shown in each evidence file. Reading-list selections last for this page session.
⬡ Citizen·0 pts·depth 0/10