THE NIGERIA PAPERS / AFRICA BUILDS

Africa builds.
Nigeria deserves more.

Factories. Railways. Power. Possibility.

Across Africa, resources are becoming things people can use. See what was built, what it cost, and what Nigeria’s money could deliver. Then ask the question that matters: where is our own value?

18 project records8 country collectionsCosts in USD sources & scope shown
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
ON THE MAP / MOROCCO

Infrastructure.
Industry. Ambition.

Tanger Med · explore the sourced record below

FOLLOW THE ACHIEVEMENT↗COMPARE THE MONEY↗DEMAND BETTER

THE MONEY QUESTION

Big numbers.
Real-world possibilities.

Borrowing must buy public value. Corruption has a human cost. Put a documented Nigerian amount beside an African project and see the scale for yourself.

World Bank-approved reform financing. This is not a finding of theft, waste, disbursement or unspent cash.

Read the original record · 13 June 2024 ↗Project cards below show nominal dollar ratios where a documented dollar cost is available. These are scale illustrations, not construction budgets or proof of equal conditions.

THE ACHIEVEMENT VAULT

Burkina Faso

Older landmarks. New ambition. A growing public record.

SOURCE-LINKED COLLECTION

BURKINA FASO / SINCE TRAORÉ TOOK OFFICE

Follow the factory, the funding and the follow-through.

These records document projects inaugurated or under construction during this administration. Public, private and cooperative investment are identified separately. A ceremony is not a production audit; completed projects and works in progress keep their own labels.

New CFA-to-dollar figures use a transparent 2024 reference of FCFA 606.4 per US$1 from the World Bank. They show scale, not the exchange rate paid at construction. The source and formula appear in each cost record.

8 project records in Burkina Faso
01🇧🇫 Burkina Faso / Industrial processing
RAFFINOR-BF refinery exterior · operator’s inauguration gallery, September 2026
RAFFINOR-BF refinery exterior · operator’s inauguration gallery, September 2026 · RAFFINOR-BF gallery · Publisher photograph · rights retained · resized; no crop
Inaugurated · 28 September 2026

Gold dug here. Value added here.

RAFFINOR-BF gold refinery

Ownership / funding: State investment through SONASP with private partners; percentages not established.

Burkina Faso’s refinery puts domestic gold processing in the spotlight. The next test is sustained production, beyond the opening ceremony.

COST · US DOLLARS
US$19MReported approximate USD equivalent · 2026Approximately US$19 million — AP’s rounded dollar equivalent of the reported investment of over FCFA 11 billion, 29 September 2026. Reported investment, not audited final expenditure.
THE TIMELINE
28 September 2026
WHAT WAS BUILT
164 tonnes/year theoretical phase-one capacity. A proposed 515-tonne phase two is not delivered output.
Open the evidence file 2 sources ↗
Who owns / delivers it?
State investment through SONASP with private partners; percentages not established.
Reported activity
Ministry reports first bars at the inauguration. Sustained annual throughput not established.
What still needs checking?
Gold processing and petroleum refining have different commodities and scope. This ceremony does not establish changes in national living standards.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

02🇧🇫 Burkina Faso / Textiles / cotton processing
Cotton-to-textile manufacturing · editorial illustration, not a photograph of TEXFORCES-BF
Cotton-to-textile manufacturing · editorial illustration, not a photograph of TEXFORCES-BFCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Inaugurated — official report · 2026-09-09

From cotton fields to finished cloth.

TEXFORCES-BF cotton-to-textile complex

Ownership / funding: Public-resource financing including social-security funds and state companies, according to the Finance Ministry; not established as debt-free.

A new textile complex was inaugurated in Bobo-Dioulasso in September 2026. The financing and launch are documented; future output claims remain targets.

COST · US DOLLARS
US$30MReported dollar equivalent · 2026Approximately US$30 million — Xinhua’s 9 September 2026 reported equivalent of FCFA 17 billion. Sources describe this amount as investment/capital; it is not an audited final construction account.
THE TIMELINE
Inaugurated 2026-09-09, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Textile and garment production. Xinhua reports an initial design rate exceeding 12 tonnes of cotton fibre per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Public-resource financing including social-security funds and state companies, according to the Finance Ministry; not established as debt-free.
Reported activity
Inauguration verified through official sources and Xinhua. Sustained throughput and actual employment not independently established.
What still needs checking?
Official initial and eventual capacity/jobs figures differ. Expansion targets are not present output; social-security funding is not free money.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

03🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2024-11-30
Official publisher photograph from the project’s inauguration report · 2024-11-30 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2024-11-30

Keep the tomato harvest’s value at home.

SOBTO / A’diaa tomato-processing factory

Ownership / funding: Community shareholding promoted through APEC; not simply a wholly state-funded factory.

The Bobo-Dioulasso factory was inaugurated after construction launched in September 2023. Its ownership model uses community shareholding.

COST · US DOLLARS
US$12.37MApproximate USD scale conversion · 2024 reference FXApproximately US$12.37 million, calculated as FCFA 7.5 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 7.5bn investment reported by L’Economiste du Faso, 21 September 2026; official launch source does not state the cost.
THE TIMELINE
Construction launched September 2023; inaugurated 30 November 2024, around 14 months later.
WHAT WAS BUILT
Officially reported processing capacity: 100 tonnes of tomatoes per day; not verified daily production.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Community shareholding promoted through APEC; not simply a wholly state-funded factory.
Reported activity
Presidency calls the factory operational at inauguration. Current utilisation and sales not independently verified.
What still needs checking?
Community subscriptions are not the same as a public grant. Job projections and design capacity are not measured outcomes.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

04🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2024-12-16
Official publisher photograph from the project’s inauguration report · 2024-12-16 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2024-12-16

A cooperative project brought to the finish line.

SOFATO tomato-processing factory, Yako

Ownership / funding: SCOOP-CA Bâtir l’Avenir cooperative with state support; Presidency reports FBDES FCFA 1bn and APEC FCFA 400m contributions.

Yako’s tomato plant opened in December 2024 with community finance and public support. The official account says an existing project was helped to restart.

COST · US DOLLARS
US$9.32MApproximate USD scale conversion · 2024 reference FXApproximately US$9.32 million, calculated as FCFA 5.65 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 5.65bn reported by L’Economiste; Presidency states over FCFA 5bn. These are descriptions of the same investment, not additive.
THE TIMELINE
Existing cooperative project supported/relaunched under Traoré; inaugurated 16 December 2024. Original construction start not established.
WHAT WAS BUILT
Reported design capacity: 100 tonnes of tomatoes per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
SCOOP-CA Bâtir l’Avenir cooperative with state support; Presidency reports FBDES FCFA 1bn and APEC FCFA 400m contributions.
Reported activity
Inauguration verified; the December report scheduled product marketing for January 2025. Later actual production not established.
What still needs checking?
The cooperative project predated the administration’s support. Do not credit its entire origin to the inauguration or treat projected turnover as earnings.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

05🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2025-02-20
Official publisher photograph from the project’s inauguration report · 2025-02-20 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2025-02-20

Turn grain into a local industrial value chain.

Moulin Double Star wheat-flour mill

Ownership / funding: Private ZIDNABA-group promoter, supported by government; not a verified state-owned or wholly state-funded mill.

A privately promoted flour mill opened at Gampéla in February 2025. Its documented launch is distinct from its future production targets.

COST · US DOLLARS
US$24.74MApproximate USD scale conversion · 2024 reference FXApproximately US$24.74 million, calculated as FCFA 15 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 15bn construction cost reported by the Presidency, 20 February 2025. Not an audited final account.
THE TIMELINE
Inaugurated 2025-02-20, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Reported design capacity: 220 tonnes of flour and 80 tonnes of bran per day.
Open the evidence file 2 sources ↗
Who owns / delivers it?
Private ZIDNABA-group promoter, supported by government; not a verified state-owned or wholly state-funded mill.
Reported activity
Inauguration verified. Production volumes, import substitution and projected employment not independently measured.
What still needs checking?
Milling capacity does not establish local wheat self-sufficiency; the source separately calls for support to wheat growers.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

06🇧🇫 Burkina Faso / Building materials
Official publisher photograph from the project’s inauguration report · 2025-03-20
Official publisher photograph from the project’s inauguration report · 2025-03-20 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2025-03-20

Make the materials needed to build.

CISINOB cement plant, Laongo

Ownership / funding: Private Chinese investors, according to the Presidency; inauguration by Traoré does not make this a government-financed project.

A private cement investment was inaugurated at Laongo in March 2025. Its capacity shows industrial scale; actual output needs follow-up evidence.

COST · US DOLLARS
US$42.88MApproximate USD scale conversion · 2024 reference FXApproximately US$42.88 million, calculated as FCFA 26 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 26bn reported investment; official article published 21 March 2025 records the 20 March ceremony.
THE TIMELINE
Inaugurated 2025-03-20, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Reported design production capacity: 2,000 tonnes of cement per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Private Chinese investors, according to the Presidency; inauguration by Traoré does not make this a government-financed project.
Reported activity
Launch verified. Sustained output and actual reductions in cement prices not established.
What still needs checking?
Investment announcement is not an audited account. Do not assert all cement inputs are domestically sourced or claim the entire plant was government-funded.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

07🇧🇫 Burkina Faso / Food processing
Official publisher photograph from the project’s inauguration report · 2024-04-29
Official publisher photograph from the project’s inauguration report · 2024-04-29 · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Inaugurated — official report · 2024-04-29

Add value before raw materials leave.

ADIPROD Industries edible-oil and shea-processing complex

Ownership / funding: Private ADIPROD Industries SA, led by Oumou Diallo/Traoré; publicly encouraged by the administration.

The first phase of a shea and edible-oil complex was inaugurated in Bobo-Dioulasso in April 2024. The account identifies it as private investment.

COST · US DOLLARS
US$29.68MApproximate USD scale conversion · 2024 reference FXApproximately US$29.68 million, calculated as FCFA 18 billion ÷ 606.4. Uses the World Bank’s 2024 XOF/USD reference for scale, not the transaction-date exchange rate. FCFA 18bn first-phase cost reported by the company’s director in the Presidency account. Not a whole-complex final expenditure audit.
THE TIMELINE
Inaugurated 2024-04-29, during Ibrahim Traoré’s administration. Construction start date not established.
WHAT WAS BUILT
Company-reported first-phase capacity: over 300 tonnes of shea kernels/oilseeds per day.
Open the evidence file 3 sources ↗
Who owns / delivers it?
Private ADIPROD Industries SA, led by Oumou Diallo/Traoré; publicly encouraged by the administration.
Reported activity
Inauguration verified by Presidency and CSC. CSC described the refining component as still being developed.
What still needs checking?
An inaugurated first phase does not prove every planned component was complete. Current throughput and projected supplier benefits not independently verified.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

08🇧🇫 Burkina Faso / Roads
Road works shown by the Presidency in January 2026; not proof of completion
Road works shown by the Presidency in January 2026; not proof of completion · Presidency of Burkina Faso · Publisher photograph · rights retained · resized; no crop
Construction documented — completion unverified · 2026-01-10

A road claim you can locate and follow.

Kaya–Barsalogho road surfacing works

Ownership / funding: Faso Mêbo Koulsé brigade with military engineering earthworks, according to the Presidency.

The official report documents work on a named corridor rather than a national promise. This entry remains under construction pending completion evidence.

COST · US DOLLARS
USD cost not verifiedUSD figure not disclosedNo public project-specific cost established from the checked source. USD cost is unavailable; no amount invented.
THE TIMELINE
Promise referenced to December 2024; site observation 8 January 2026, published 10 January 2026. No verified completion date.
WHAT WAS BUILT
42 km corridor; source reports a 9-metre road footprint.
Open the evidence file 1 sources ↗
Who owns / delivers it?
Faso Mêbo Koulsé brigade with military engineering earthworks, according to the Presidency.
Reported activity
Official site report describes work underway on 8 January 2026 and preparation to lay the surface. Completion not verified.
What still needs checking?
The nationwide 3,000–5,000 km/year objective is a target, not completed road length. Equipment acquisition budgets cannot be assigned to this road.

Source-linked record · record review: 2026-10-24. Dates and costs retain the original source’s scope; this preview does not certify an audit.

A VAULT, NOT A VICTORY LAP

Keep the record growing.

This collection starts with 18 documented projects. Education, health, agriculture and water need more coverage. New source discoveries appear below; project stories require a separate evidence review before joining the vault.

Share a source
From the research desk Open collected Africa source records ↗

Research leads can concern policy or procurement rather than completed infrastructure. They are separate from the achievement vault.

Growing source desk

Latest source records

50 source records

Records from approved publishers appear automatically with original links and dates. Announcements are attributed to their authors; delivery, spending and allegations need supporting evidence.

Collection: partial · last successful check: 2026-11-03T16:04:21.840551Z.

Some sources could not be checked
  • Library of Congress: TimeoutError: The read operation timed out

Celebrating delivery. Challenging waste. Preserving the evidence.

How we verify ↗Nigeria’s projects ↗Evidence archive ↗Preview updated 24 October 2026. USD figures are historical source amounts, not current replacement prices. Cost updates have their own sources; existing project review dates are retained. Project-specific review dates are shown in each evidence file. Reading-list selections last for this page session.