THE NIGERIA PAPERS / AFRICA BUILDS

Africa builds.
Nigeria deserves more.

Factories. Railways. Power. Possibility.

Across Africa, resources are becoming things people can use. See what was built, what it cost, and what Nigeria’s money could deliver. Then ask the question that matters: where is our own value?

18 project records8 country collectionsCosts in USD sources & scope shown
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
ON THE MAP / MOROCCO

Infrastructure.
Industry. Ambition.

Tanger Med · explore the sourced record below

FOLLOW THE ACHIEVEMENT↗COMPARE THE MONEY↗DEMAND BETTER

THE MONEY QUESTION

Big numbers.
Real-world possibilities.

Borrowing must buy public value. Corruption has a human cost. Put a documented Nigerian amount beside an African project and see the scale for yourself.

World Bank-approved reform financing. This is not a finding of theft, waste, disbursement or unspent cash.

Read the original record · 13 June 2024 ↗Project cards below show nominal dollar ratios where a documented dollar cost is available. These are scale illustrations, not construction budgets or proof of equal conditions.

THE ACHIEVEMENT VAULT

Ghana

Older landmarks. New ambition. A growing public record.

SOURCE-LINKED COLLECTION
3 project records in Ghana
01🇬🇭 Ghana / Ports
MPS Terminal 3, Tema · operator photograph taken 20 August 2019
MPS Terminal 3, Tema · operator photograph taken 20 August 2019 · APM Terminals · Publisher photograph · rights retained · resized; no crop
Operating · Phases one and two commissioned 13 November 2025

Make room for trade.

Tema Terminal 3

Ghana’s expanded container terminal shows how a port investment can be examined against capacity and actual service performance.

COST · US DOLLARS
US$1.5BPPP project estimate · 2024US$1.5 billion — estimated project cost in Ghana’s 2024 PPP report. Estimate, not audited final spend.
THE TIMELINE
Phases one and two commissioned 13 November 2025
WHAT WAS BUILT
3 million TEU/year — reported capacity, not throughput.
Open the evidence file 2 sources ↗
Who owns / delivers it?
MPS concession; GPHA 30% equity, reported in the 2024 finance ministry PPP report.
Reported activity
2024 import-truck turnaround: 90 minutes against a 60-minute target. Export trucks: 40 minutes against a 90-minute target.
What still needs checking?
A public-private concession with different phases. Cost is estimated; scanner breakdowns contributed to the missed import target.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

02🇬🇭 Ghana / Ports
Dry bulk terminal berth · GPHA’s July 2022 handover report
Dry bulk terminal berth · GPHA’s July 2022 handover report · Ghana Ports and Harbours Authority · Publisher photograph · rights retained · resized; no crop
Commissioned · Initial berth handed over 25 July 2022; commissioning reported 8 December 2022

Build the route from mine to market.

Takoradi Dry Bulk Terminal

A dedicated bulk terminal gives Ghana another piece of its industrial logistics network. Its specific cost still needs stronger public evidence.

COST · US DOLLARS
US$85MReported completion cost · 2022US$85 million — completed dry bulk terminal cost attributed to the President by Ghana News Agency on 8 December 2022. Excludes the separate container terminal, dry dock and oil/gas terminal.
THE TIMELINE
Initial berth handed over 25 July 2022; commissioning reported 8 December 2022
WHAT WAS BUILT
Withheld: published capacity figures conflict.
Open the evidence file 3 sources ↗
Who owns / delivers it?
GPHA infrastructure; Amandi Ghana Limited identified as contractor.
Reported activity
Actual annual throughput not established.
What still needs checking?
Other port investments and the floating dry dock have different scopes. Their budgets cannot be assigned to this terminal.

Source-linked record · record review: 2026-10-13. Dates and costs retain the original source’s scope; this preview does not certify an audit.

03🇬🇭 Ghana / Power
Hydropower dam and generating station · editorial illustration, not a photograph of the actual project
Hydropower dam and generating station · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operational · 19 December 2013

Power that has a physical address.

Bui Generating Station

Ghana’s Bui station is a concrete reference for discussing the cost and capacity of a power investment.

COST · US DOLLARS
US$790MBui Power Authority reported total after supplementary fundingOperator reports initial US$622m estimate and US$790m total project cost after supplementary funding. Use US$790m with attribution, not both figures added together.
THE TIMELINE
EPC contract signed 19 April 2007; main station commissioned December 2013.
WHAT WAS BUILT
404 MW: three approximately 133.33 MW units plus a 4 MW turbinette.
Open the evidence file 2 sources ↗
Who owns / delivers it?
Government of Ghana / Bui Power Authority; Sinohydro EPC contractor. Commissioned during John Dramani Mahama's first presidency; initiation spans earlier governments.
Reported activity
Operator page marks station operational and describes completed maintenance. Installed capacity is not actual annual electricity generated.
What still needs checking?
Hydropower output depends on hydrology. The project includes transmission, resettlement and other infrastructure, making a bare dollars-per-MW comparison incomplete.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

Bui Power Authority station photographs

All rights reserved; link only unless separate reuse permission is obtained.

A VAULT, NOT A VICTORY LAP

Keep the record growing.

This collection starts with 18 documented projects. Education, health, agriculture and water need more coverage. New source discoveries appear below; project stories require a separate evidence review before joining the vault.

Share a source
From the research desk Open collected Africa source records ↗

Research leads can concern policy or procurement rather than completed infrastructure. They are separate from the achievement vault.

Growing source desk

Latest source records

50 source records

Records from approved publishers appear automatically with original links and dates. Announcements are attributed to their authors; delivery, spending and allegations need supporting evidence.

Collection: partial · last successful check: 2026-11-03T16:04:21.840551Z.

Some sources could not be checked
  • Library of Congress: TimeoutError: The read operation timed out

Celebrating delivery. Challenging waste. Preserving the evidence.

How we verify ↗Nigeria’s projects ↗Evidence archive ↗Preview updated 24 October 2026. USD figures are historical source amounts, not current replacement prices. Cost updates have their own sources; existing project review dates are retained. Project-specific review dates are shown in each evidence file. Reading-list selections last for this page session.