Public BetaThe Nigeria Papers™ is in public beta. Source records are being expanded and verified continuously. Verified facts, documented claims, allegations, and under-review material are labeled separately. Methodology →

THE NIGERIA PAPERS / AFRICA BUILDS

Africa builds.
Nigeria deserves more.

Factories. Railways. Power. Possibility.

Across Africa, resources are becoming things people can use. See what was built, what it cost, and what Nigeria’s money could deliver. Then ask the question that matters: where is our own value?

18 project records8 country collectionsCosts in USD sources & scope shown
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
ON THE MAP / MOROCCO

Infrastructure.
Industry. Ambition.

Tanger Med · explore the sourced record below

FOLLOW THE ACHIEVEMENT↗COMPARE THE MONEY↗DEMAND BETTER

THE MONEY QUESTION

Big numbers.
Real-world possibilities.

Borrowing must buy public value. Corruption has a human cost. Put a documented Nigerian amount beside an African project and see the scale for yourself.

World Bank-approved reform financing. This is not a finding of theft, waste, disbursement or unspent cash.

Read the original record · 13 June 2024 ↗Project cards below show nominal dollar ratios where a documented dollar cost is available. These are scale illustrations, not construction budgets or proof of equal conditions.

THE ACHIEVEMENT VAULT

Tanzania

Older landmarks. New ambition. A growing public record.

SOURCE-LINKED COLLECTION
1 project records in Tanzania
01🇹🇿 Tanzania / Rail
Electric intercity railway · editorial illustration, not a photograph of the actual project
Electric intercity railway · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operating segment; wider network under construction · Passenger-service inauguration 1 August 2024; EMU service added 1 November 2024.

Connect cities. Then measure the service.

Dar es Salaam–Dodoma electric SGR passenger service

Tanzania’s electric passenger railway links Dar es Salaam and Dodoma. This record keeps that section separate from later extensions.

COST · US DOLLARS
US$3.1BReuters-reported segment cost, 2024-08-01US$3.1bn reported by Reuters on 1 August 2024 for the Dar es Salaam–Dodoma railway. Independent cost reporting, not a retrieved audited final project account.
THE TIMELINE
Dar es Salaam–Dodoma operation is separate from later extensions toward Mwanza and Kigoma.
WHAT WAS BUILT
Electric standard-gauge intercity rail; do not claim the whole planned 2,561 km system is complete.
Open the evidence file 4 sources ↗
Who owns / delivers it?
Tanzania Railways Corporation / Government of Tanzania; inaugurated by President Samia Suluhu Hassan. Construction spans the preceding administration.
Reported activity
TRC's 2026 updates distinguish operating Dar es Salaam–Dodoma services from construction north and west of the operating segment.
What still needs checking?
Segment costs cannot be assigned to the full national SGR network. Do not treat contract totals for other phases as expenditure on this operating segment.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

TRC's electric multiple-unit launch photographs

Institutional news photos; link only unless a reuse licence is established.

A VAULT, NOT A VICTORY LAP

Keep the record growing.

This collection starts with 18 documented projects. Education, health, agriculture and water need more coverage. New source discoveries appear below; project stories require a separate evidence review before joining the vault.

Share a source
From the research desk Open collected Africa source records ↗

Research leads can concern policy or procurement rather than completed infrastructure. They are separate from the achievement vault.

Growing source desk

Latest source records

50 source records

Records from approved publishers appear automatically with original links and dates. Announcements are attributed to their authors; delivery, spending and allegations need supporting evidence.

Collection: partial · last successful check: 2026-11-03T16:04:21.840551Z.

Some sources could not be checked
  • Library of Congress: TimeoutError: The read operation timed out

Celebrating delivery. Challenging waste. Preserving the evidence.

How we verify ↗Nigeria’s projects ↗Evidence archive ↗Preview updated 24 October 2026. USD figures are historical source amounts, not current replacement prices. Cost updates have their own sources; existing project review dates are retained. Project-specific review dates are shown in each evidence file. Reading-list selections last for this page session.
⬡ Citizen·0 pts·depth 0/10