Public BetaThe Nigeria Papers™ is in public beta. Source records are being expanded and verified continuously. Verified facts, documented claims, allegations, and under-review material are labeled separately. Methodology →

THE NIGERIA PAPERS / AFRICA BUILDS

Africa builds.
Nigeria deserves more.

Factories. Railways. Power. Possibility.

Across Africa, resources are becoming things people can use. See what was built, what it cost, and what Nigeria’s money could deliver. Then ask the question that matters: where is our own value?

18 project records8 country collectionsCosts in USD sources & scope shown
Tanger Med, Morocco · archival photograph, September 2019
Tanger Med, Morocco · archival photograph, September 2019 · Adam Cli · CC BY-SA 4.0 · resized; no crop
ON THE MAP / MOROCCO

Infrastructure.
Industry. Ambition.

Tanger Med · explore the sourced record below

FOLLOW THE ACHIEVEMENT↗COMPARE THE MONEY↗DEMAND BETTER

THE MONEY QUESTION

Big numbers.
Real-world possibilities.

Borrowing must buy public value. Corruption has a human cost. Put a documented Nigerian amount beside an African project and see the scale for yourself.

World Bank-approved reform financing. This is not a finding of theft, waste, disbursement or unspent cash.

Read the original record · 13 June 2024 ↗Project cards below show nominal dollar ratios where a documented dollar cost is available. These are scale illustrations, not construction budgets or proof of equal conditions.

THE ACHIEVEMENT VAULT

Kenya

Older landmarks. New ambition. A growing public record.

SOURCE-LINKED COLLECTION
1 project records in Kenya
01🇰🇪 Kenya / Geothermal power
Geothermal power infrastructure · editorial illustration, not a photograph of the actual project
Geothermal power infrastructure · editorial illustration, not a photograph of the actual projectCreated for this project’s subject; not documentary evidence or an exact reconstruction.
Operating · Construction completed in 2019; formal commissioning in July 2022.

Put the earth’s heat to work.

Olkaria V geothermal power station

Kenya’s geothermal expansion is a reference point for discussing investment in a country’s own energy resources.

COST · US DOLLARS
US$450MOperator project estimate · 2018US$450 million — KenGen’s project estimate published 31 October 2018, covering steamfield, power plant and grid connection. This is an estimate, not verified final expenditure.
THE TIMELINE
Construction began January 2017; generation and ceremony dates are distinct.
WHAT WAS BUILT
172 MW current operator-reported capacity; older planning documents quote 165.4 MW.
Open the evidence file 4 sources ↗
Who owns / delivers it?
KenGen; H-Young, Mitsubishi Corporation and Mitsubishi Hitachi Power Systems supplied/constructed components. Uhuru Kenyatta's administration at formal commissioning.
Reported activity
KenGen lists it among its generating plants. A 2026 chemistry-laboratory equipment tender corroborates ongoing plant support; actual recent annual output not established.
What still needs checking?
Technical nameplate ratings and later operational ratings differ. Geothermal conditions and bundled field-development costs affect comparisons with hydro, gas or solar.

Source-linked record · record review: 2026-10-18. Dates and costs retain the original source’s scope; this preview does not certify an audit.

Open original project gallery ↗

KenGen geothermal plant images

KenGen all rights reserved; link only pending reuse permission.

A VAULT, NOT A VICTORY LAP

Keep the record growing.

This collection starts with 18 documented projects. Education, health, agriculture and water need more coverage. New source discoveries appear below; project stories require a separate evidence review before joining the vault.

Share a source
From the research desk Open collected Africa source records ↗

Research leads can concern policy or procurement rather than completed infrastructure. They are separate from the achievement vault.

Growing source desk

Latest source records

50 source records

Records from approved publishers appear automatically with original links and dates. Announcements are attributed to their authors; delivery, spending and allegations need supporting evidence.

Collection: partial · last successful check: 2026-11-03T16:04:21.840551Z.

Some sources could not be checked
  • Library of Congress: TimeoutError: The read operation timed out

Celebrating delivery. Challenging waste. Preserving the evidence.

How we verify ↗Nigeria’s projects ↗Evidence archive ↗Preview updated 24 October 2026. USD figures are historical source amounts, not current replacement prices. Cost updates have their own sources; existing project review dates are retained. Project-specific review dates are shown in each evidence file. Reading-list selections last for this page session.
⬡ Citizen·0 pts·depth 0/10